Volume discount: 5 pcs 2% · 10 pcs 3% · 25 pcs 5%Rätt rotationsriktning innan motorn startar: så kontrollerar du fasföljden på några sekunderHow to get ±0.2 °C in both freezer and oven with a thermometer for type T probesHow to find 0.02 mm of runout in a bore where a standard dial indicator will never fitLegionella Control That No Longer Ends Up in a Binder of Handwritten TemperaturesThe cutting fluid always looks the same, but the concentration in the tank doesn’tMeasuring from an image is only reliable when the magnification travels with the imageThe freezer lost temperature overnight – with an alert on your phone, you’ll know before the samples are ruinedWith a Steerable Camera Head, You See the Fault Before You Take the Machine ApartA Bore That Is Right at the Opening Can Be Wrong 400 mm Further InWhen the naked eye isn’t enough: measure and document the defect directly in the image instead of guessingVolume discount: 5 pcs 2% · 10 pcs 3% · 25 pcs 5%Rätt rotationsriktning innan motorn startar: så kontrollerar du fasföljden på några sekunderHow to get ±0.2 °C in both freezer and oven with a thermometer for type T probesHow to find 0.02 mm of runout in a bore where a standard dial indicator will never fitLegionella Control That No Longer Ends Up in a Binder of Handwritten TemperaturesThe cutting fluid always looks the same, but the concentration in the tank doesn’tMeasuring from an image is only reliable when the magnification travels with the imageThe freezer lost temperature overnight – with an alert on your phone, you’ll know before the samples are ruinedWith a Steerable Camera Head, You See the Fault Before You Take the Machine ApartA Bore That Is Right at the Opening Can Be Wrong 400 mm Further InWhen the naked eye isn’t enough: measure and document the defect directly in the image instead of guessing

The Right Direction of Rotation Before the Motor Starts: How to Check Phase Sequence in Seconds

Published 27 November 2026 at 05:15

You have probably seen it: a new pump is connected, the start button is pressed, and after a couple of seconds there is a strange noise or no flow at all. Two phases were swapped along the way, and the motor runs the wrong way. In the best case, it is enough to swap two conductors. In the worst case, a compressor, an impeller or a V-belt has already been damaged.

Mätare för fassekvens

What a phase sequence meter is

A phase sequence meter shows the order in which the three phases arrive at a three-phase outlet or terminal block. This model works with an input voltage from 75 to 1000 VAC and a frequency range of 45 to 65 Hz. You connect the three color-coded alligator clips to phases L1, L2 and L3. LEDs show whether the phase sequence is clockwise or counterclockwise, and whether each individual phase is live.

What problems it solves

The instrument gives you answers before power reaches the motor. A buzzer sounds intermittently when the correct phase sequence is detected and continuously if it is reversed. This means you do not need to look at a display while holding a clamp in each hand. The LEDs also show if a phase is missing, which is a common reason why three-phase motors hum or fail to start. The brightness can be switched between high and low, so the reading works both in a dark technical corridor and in sunlight outdoors.

When and why it is used

The check is performed during new installations, after a switchboard has been modified, after repairs to a cable or outlet, and when a mobile machine is connected to a new supply point. Handling is simple. The housing has a magnet on the back that attaches to the switchboard, and the fully insulated clips with wide jaws provide a firm grip. Three 30-inch (approx. 75 cm) leads are built in, so nothing is missing when you arrive on site. Always work in accordance with applicable electrical safety regulations and with proper authorization when connecting to live parts.

Three practical use cases

Machine shop industry: A new column drill, compressor or chip extraction fan is moved to a different location in the facility. Measure the phase sequence at the new outlet before connecting the machine, so you know whether a phase inverter is needed.

Food production: Conveyor belts, mixers and refrigeration compressors can only afford a few minutes of production downtime during service. After a motor replacement, you check the direction of rotation at the terminal block instead of testing by trial and error, which risks damaging equipment that needs to be hygienic and reliable.

Temporary power and installation: Construction power, rented generator sets and field connections often have an unclear phase order. A quick reading saves troubleshooting and prevents pumps or fans from running backwards.

Why it pays off

The instrument costs a fraction of a compressor or a larger pump unit. Every miswired start that is avoided saves repairs, downtime and often an extra service day. The work also becomes more predictable: you know the phase order before you leave the panel and do not have to stand and listen for faults during the first revolution. A battery warning, a carrying case and four AA batteries are included, so the meter is ready to use right away.

If you regularly connect or move three-phase equipment, a phase sequence meter is a small tool that prevents major damage. See the phase sequence meter here.